It started out surrounded by a stage platform. It was too well built to go tumbling down. However, persistence and hard work finally leveled the wall around the old baptism pool and we’re now ready to fill the hole and patch the concrete floor for the new storage area. Thanks to all who contributed to this milestone (see pics in prior blog posts too). Special thanks to one industrious worker who hammer drilled holes around the base of the wall to make it easier to separate the wall from the floor.
St Thomas United Methodist Church
Comments